Engineering Change Order (ECO)

Engineering Change Order (ECO) is the data object that authorizes a specific change to released engineering data — typically following an ECR (request) and preceding the ECN (notice). It carries the technical detail, impact analysis, approvals, and effectivity that make a change real in the configuration baseline.

What it covers

  • Change description and rationale with linked problem reports and ECR.
  • Impact analysis across parts, BOMs, drawings, tools, and certifications.
  • Approval routing through the Change Review Board with role-based signoffs.
  • Effectivity rules — date, unit, lot, or serial-number based.
  • Implementation actions — revision bumps, BOM edits, document re-releases.

Relationships (see sidebar)